Emergency?Call us now
£85 call-out in Norwich

Bathroom installation in Norwich and Norfolk

A full bathroom start to finish, or a straight swap of what is there. One engineer through the whole job rather than four trades who never meet, and a written price before anything comes out

Newly fitted bath with a shower screen and full height tiling

The short version

Price
Written and fixed after a free survey
Included
Tiling, wastes, waterproofing and making good
Straight swap
Two to three days
Full refit
Usually one to two weeks
One engineer
The same person from first day to last
Unvented cylinders
G3 qualified, if pressure is the problem

What we get called out to

The faults that make up most of the work, and what usually causes them

A straight swap

Same layout, new suite. The quickest and cheapest version, and often all a tired bathroom needs

Bath out, shower in

Wastes and floor levels are the real work here, not the shower itself

Full refit with a new layout

Moving the soil connection is what decides the cost. Worth settling at survey rather than mid-job

Adding an en suite

Needs a check the system can carry another outlet before anything else is decided

Weak or unpredictable shower

Usually pressure rather than the shower. Sometimes a pump, sometimes an unvented cylinder

Leak into the room below

Nearly always failed waterproofing behind tiles rather than the pipework. Tiles are not waterproof on their own

What does a bathroom fit include?

Strip out, first fix pipework and wastes, waterproofing, tiling, second fix, sealing and making good. The old suite goes with us and the room is left clean and usable

The waterproofing is the part nobody sees and the part that decides whether the ceiling below is fine in five years. Tanking behind a shower is not optional and it is not a coat of paint — tiles and grout hold water out for a while and then they do not

You get a written fixed price after a survey. If moving the soil pipe or the floor turns out to be the expensive part, that is settled before anything is torn out rather than found halfway through

How long does a bathroom take?

A straight swap in the same layout is two to three days. A full refit with new tiling and a changed layout is usually one to two weeks depending on the room and the tiling

It is one engineer throughout rather than a rotation of trades, so nobody is waiting on somebody else to turn up. That is slower on paper than a four-man crew and considerably less likely to stall for a week in the middle

Why is my shower weak?

Usually the water pressure feeding it rather than the shower itself. A gravity-fed system with a tank in the loft gives you very little pressure upstairs, and a new shower head will not change that

The fix is either a pump or a change to a mains-pressure system with an unvented cylinder. AK Plumbing and Heating is G3 qualified, so the cylinder side is done in-house — that gets checked as part of the survey rather than sold to you afterwards

Instant estimateStep 1 of 2

How soon, and whereabouts?

The postcode is how we check we cover you

How soon do you need someone
Your postcode

Where we cover

Bathroom installation across 54 towns, villages and neighbourhoods — see the full list

Questions we get asked

Straight answers, including when the answer is not to book us

Worth reading first

Some of this you can sort out yourself, and we would rather you knew that

Need bathroom installation? Ring and we will tell you straight